Blockstream says the facility, which will generate 3.8 megawatts of power, will be completed by the end of 2022. Post navigation Blockstream and Block Inc to build solar Bitcoin mining facility powered by Tesla technology Blockstream and Block will launch a bitcoin mining center powered by Tesla batteries and solar energy